Format

Where they stand, against the references you set.

A comparison puts the prospect's figures next to yours, side by side. The reference values are the ones you enter: your data, your experience, your sample. Embra does not supply benchmarks, and does not pretend to.

What you describe

Step 3 of 3
€1.10
€2.35
€1.95
Your siteSector medianTop-quartile performers
Source: EIA CBECS + EIA commercial rate, 2026
Source: EIA CBECS, top-quartile efficiency
Each bar shows the annual electricity cost per square foot. Your site sits where it sits relative to the median and the top-quartile performers in its building category. The gap between your bar and the top-quartile bar is the range where efficiency gains are typically found.
LOW OPERATIONAL RISK
Your site’s operational profile suggests relatively controlled conditions. If your cost per square foot is nonetheless above the top-quartile benchmark, the driver is more likely to be tariff structure, occupancy patterns, or a specific system rather than broad operational failure. The bar chart above is the starting point for that conversation.
Open the link
Confidential content
1,400
buildings under management
19%
average energy reduction in year one
140
people
3
countries
tail GroupMerrowfield PropertiesBrantside LogisticsHalvorn Retail Group

When this format works best

You have seen enough clients to know what normal looks like

Your sample becomes the reference your prospect is measured against.

Your prospect has no idea whether their number is good or bad

The comparison answers that in one glance.

A relative gap says more in your field than an absolute amount

Position persuades where a raw figure would not.

What you get back

Their figures and the gap, attached to the lead

Every value they entered and how far it sits from your reference.

A starting point that's already about them

You open on their own numbers instead of a pitch.

A LinkedIn and email kit built to distribute it

Posts, hooks and a landing section generated with the comparison, ready to publish the day it goes live.

Try this format

This is a working comparison, made with Embra. A facilities group puts your cost per square foot next to the references they set.

Open the example →

Fictional company. Illustrative data.

How this one gets built

01

You enter your reference values

Your data, your sample, your experience. Embra doesn't supply benchmarks.

02

Embra builds the comparison

Your prospect enters their figures and sees the gap, side by side.

03

You choose what to show and publish

Show or hide the source behind each reference, then go live.

Questions

Where do the reference values come from?+

From you. You enter them. Embra supplies no benchmarks and invents none.

How is this different from the calculator?+

The calculator returns an absolute amount. The comparison returns a relative position against your references.

What if I don't have reference data?+

Then this is not the right format. An audit or a calculator will work better.

Turn your expertise into your best source of clients.

Live in under an hour. No credit card.